Road Closure – Jubilee Road

Posted:

EN
FR

Updated:

Le texte en français suit.

Location: Jubilee Road, between Edward and Robie streets

Date: Wednesday, March 11

Time: 9 a.m. to 3 p.m.

Work details: This work is related to a nearby development at 1694 Robie Street.

Traffic impact: The road will be closed to eastbound traffic only, with detours and traffic control signs to guide drivers through the area. Westbound traffic will not be impacted. Drivers should expect delays and are asked to use alternative routes where possible.

Pedestrian impact: The south sidewalk of Jubilee Road will be closed. Pedestrians are asked to use alternative routes as directed. 


Fermeture de route – Jubilee Road

Lieu : Jubilee Road, entre les rues Edward et Robie

Date : Jeudi 11 mars

Heure : De 9 h à 15 h

Description des travaux : Ces travaux sont en lien avec un aménagement à proximité, situé au 1694, rue Robie.

Répercussions sur la circulation : La route sera fermée pour la circulation en direction est seulement. Des détours et des panneaux de circulation seront sur place pour guider les conducteurs dans le secteur. La circulation en direction ouest ne sera pas touchée. Les conducteurs doivent s’attendre à des ralentissements et sont priés d’emprunter d’autres itinéraires dans la mesure du possible.

Répercussions pour les piétons : Le trottoir du côté sud de Jubilee Road sera fermé pendant les travaux. Les piétons devront emprunter d’autres itinéraires selon les directives.